Making of · ahead of BAU Munich 2027

Villa Ellipse, precision
behind the curves

Villa Ellipse: seven radii of curvature, curved glass up to six metres high and sashes weighing nearly one tonne. A project that pushes the boundaries of minimalist aluminium window and door systems.

Rendu 3D de la villa Ellipse : dalles blanches au-dessus d’une paroi de verre courbe sur chambre
Project overview
Project
Villa Ellipse
Architect
Liora Krelenstein-Wald
Installation partner
M.D. Aluminium
Joinery
Weeeze, curved sliding glass doors
6,000 mm
maximum sash height
3 to 18 m
radius of curvature within a single system
22 m
developed length of the ellipse
100 %
concealed frame

Ellipse: from a 3D model to an architect-designed villa

Behind this villa designed by architect Liora Krelenstein-Wald lie several years of research and development, bespoke technical solutions and close collaboration between WEEEZE and our partner M.D. Aluminium. How do you turn an ambitious geometry into an assembly that is manufactured, transported and installed with precision? A look behind the scenes of an exceptional project.

Rendu 3D vu depuis le jardin : deux niveaux de vitrage courbe sous deux dalles, terrasse et bassin
3D of the villa, viewed from the garden
01

From architectural intent to technical challenge

It all begins with a 3D model: the house draws a continuous curve, wide open to the outdoors. At its heart, the project is an architectural vision. Turning that vision into reality brings a new challenge: making it work technically.

The initial geometry, made up of a succession of radii of curvature, did not allow the sliding glass doors to operate smoothly. Approved in August 2021 with M.D. Aluminium, the project entered the engineering and R&D phase. WEEEZE then set about optimising the curves to meet operating constraints while preserving the architect’s intent.

This study resulted in seven distinct radii of curvature, ranging from 3 to nearly 18 metres, for a total of 11 sashes. Defining them was a decisive step, as it determines the design of the profiles, the manufacture of the curved glass and the proper operation of the whole system.

In parallel, WEEEZE carried out in-depth research to identify suppliers specialised in glazing and bending, able to support the project over the long term and meet its specific requirements. This groundwork is essential to anticipate, from the earliest design stages, the constraints of manufacturing and installation.

“When you look at the initial sketch,
you had to be a little crazy to say: we’re going to do it.”
Hervé Lateltin, International Business Manager at Weeeze
Rendu 3D de l’intérieur : séjour sur double hauteur ouvert sur le jardin par une paroi vitrée courbe
3D of the villa, interior view
02

Curved Glass and Aluminium Profiles: Matching the Curves

Once the radii were defined and the suppliers identified, a new challenge emerged: achieving a perfect match between the geometry of the aluminium profiles and that of the curved glass. This precise alignment is essential to ensure proper assembly and smooth operation of the sliding glass doors.

“The real challenge is getting the radius of the aluminium to match the radius of the glass perfectly.”
Hervé Guerrisi, Production Manager at Weeeze

Fine-tuning relies on close coordination between aluminium bending and curved glass manufacturing. Each component has its own constraints and must still integrate seamlessly into the whole. The challenge is also an industrial one: making the process reliable enough that components, manufactured and then shipped as a kit, can be assembled on site and work correctly from the moment they are installed.

Villa Ellipse illustrates a core requirement of bespoke work: mastering not only the geometry of each part, but also how the parts interact, how they perform and how they are installed.

03

Designing for manufacture and assembly

The complexity of Ellipse does not end with the manufacture of the sliding glass doors. Delivering and installing them on a site far from the workshops means anticipating every stage of assembly.

The subframes are prepared in WEEEZE’s workshops, then divided into several sections to make them easier to transport. On site, they are reassembled to form the structures for the ground floor and the upper floor. Some profiles also require adjustment directly on site to suit real installation conditions.

On Villa Ellipse, the singular geometry of the façade called for custom-designed joints, tailored to the specifics of the project. The main technical challenge lay in the changing height of the main sliding glass door, which drops from 6 to 3 metres along the curve. Precise work was carried out to ensure the aesthetic continuity of the façade at this critical point. Our teams developed bespoke profile connections to meet the architectural requirements while ensuring technical precision and a high-quality finish.

These adaptations show how much depends on the work done upstream: every element must meet the geometric and technical constraints of the project, while anticipating the demands of transport, assembly and installation.

Détail d’un profilé aluminium noir à la jonction de deux vitrages, sur un sol en béton ciré
Detailed view of the Weeeze system
Panneau de verre cintré posé à l’angle de la façade, échafaudage roulant à l’intérieur
Installation of curved glass panels
Making-of video

Behind the scenes of Villa Ellipse, with the people who built it

The Weeeze and M.D. Aluminium teams look back on the project, from workshop to site.

Watch the design process on YouTube
Dans l’atelier Weeeze, Matthieu Dupuis, Hervé Lateltin et David Ben-Hamou autour du tracé de la courbe à l’échelle 1 marqué au sol
04

From development to installation

After several years of development, the construction site marks the shift from studies to reality. In March 2024, M.D. Aluminium installed the first three-metre frames in the bedroom. In February 2025, the large sliding glass doors and their motorisation were put in place.

Some glass units weigh between 900 and 1,000 kg, making them particularly delicate to handle. Installing them demands rigorous preparation, great precision and perfect coordination between teams. The extensive experience of the M.D. Aluminium installation teams with WEEEZE products, together with their professionalism, enabled them to meet the specific challenges of installing these exceptionally large glass panels.

Beyond design and manufacturing, the success of the project rests on the quality of execution. Technical mastery, compliance with installation requirements and precision in the final adjustments are indispensable to guarantee a compliant installation and to protect all the work done upstream.

“The product has to be the best. But the solution
matters more than the product.”
David Ben-Hamou, CEO of M.D. Aluminium

Ellipse illustrates a fundamental conviction: the success of an exceptional project depends as much on the quality of the solutions devised as on the expertise of the teams who bring them to life on site.

Un panneau de verre courbe levé à la grue avec une ventouse à vide, devant la villa en construction
Lifting and installing a glass panel using a crane and vacuum lifter
Vue intérieure du séjour : paroi vitrée courbe de grande hauteur ouverte sur la piscine et le jardin
Interior view of the 6-metre-high sliding glass doors
05

Pushing the limits of bespoke joinery

Villa Ellipse goes well beyond an exceptional joinery project. It shows what research and development, industrial adaptability and collaboration between partners make possible when architectural ambition becomes a shared goal.

From defining the radii of curvature to installing the glazing, every stage required rethinking standard methods, developing custom solutions and bringing together complementary expertise. This approach embodies WEEEZE’s philosophy: bringing the most ambitious architectural projects to life by combining technical precision, reliability and quality of execution.

Ellipse will be unveiled to the public at BAU in Munich, January 11 to 15, 2027. In the meantime, one thing is clear: the most fluid architectural curves often conceal considerable technical complexity.

Rendu 3D de l’entrée : chemin, élément vertical en pierre sombre et vitrage courbe d’angle
BAU Munich · January 11 to 15, 2027 · Hall C, Stand 518

The finished villa, in pictures at BAU Munich

Photographs of the completed project will be shown on our stand. In the meantime, discover the behind-the-scenes video or learn more about our curved sliding glass doors.

Get inspired by our most beautiful achievements
and discover our latest news

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
WEEEZE est sur LinkedinWEEEZE est sur instagram